TM 5-2410-240-23-1
0023
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.
0023
CID FMI CODE
TEST OR INSPECTION
CORRECTIVE ACTION
N OT E
0358-05 Implement Pilot
Pressure Supply Current
Always inspect harness connectors thatare involved in the circuit. Poor
Below Normal
connections can often be the cause of an electrical circuit problem.
Verify that all connections in circuit are clean and secure, and
connections are in good condition. If problem with connection is found,
correct problem and verify diagnostic code is active before performing
this procedure.
Perform open or short circuit test ateach harness connection to identify
correct harness to replace.
Tag wiring harnesses to aid installation.
Perform this test only if condition is active.
Test Step 1. Test for Open Imple-
ment Pilot Pressure Supply Sole-
noid.
machine control D6K ECM and
verify 0358-05 is active.
2. Turn ignition switch and battery
disconnect switch to OFF position
(TM 5-2410-240-10).
3. For D6K Dozer with Ripper,
remove rear plates from machine
to access valve bank (WP 0196).
For D6K Dozer with Winch,
remove rear bottom guards (WP
0156) from machine to access
valve bank (WP 0197).
4. Disconnect chassis wiring har-
ness connector CH-C17 from
implement pilot pressure supply
Figure 261).
5. Connect jumper wire between
CH-C17 terminal 1 and terminal 2:
Figure 261).
6. Turn battery disconnect switch
and ignition switch to ON position
(TM 5-2410-240-10).