TM 5-2410-240-23-1
0023
Table 2. Blade, Winch, and Ripper Troubleshooting With Codes - Continued.
0023
CID FMI CODE
TEST OR INSPECTION
CORRECTIVE ACTION
0358-06 Implement Pilot
No Continuity on Test Point -
Pressure Supply Current
Replace machine ECM: with Ripper
Above Normal - Continued
(WP 0147); with Winch (WP 0149).
ure 218) and ground.
Connect platform wiring harness con-
on equipment ECM (WP 0148).
Connect platform wiring harness con-
on chassis wiring harness connector
Ripper (WP 0150); with Winch (WP
0155).
Connect chassis wiring harness con-
nector CH-C17 on implement pilot
For D6K Dozer with Ripper, install
rear plates on machine (WP 0196).
For D6K Dozer with Winch, install rear
bottom guards on machine (WP
0156).
Proceed to step 9.
platform wiring harness: with Ripper
(WP 0150); with Winch (WP 0155).
Connect chassis wiring harness con-
nector CH-C17 on implement pilot
For D6K Dozer with Ripper, install
rear plates on machine (WP 0196).
For D6K Dozer with Winch, install rear
bottom guards on machine (WP
0156).
Proceed to step 9.
Code 0358-06 Active - Repeat trou-
machine control D6K ECM and
bleshooting code from the beginning.
verify 0358-06 is not active.
Code 0358-06 Not Active - Trouble-
shooting complete.
0023-27