TM 5-2410-240-23-2
0039
FOLLOW-ON TASKS
00039
1. Fill hydraulic system with hydraulic oil (WP 0160).
4. Fill cooling system with engine coolant (WP 0043).
5. Install right engine access panel (WP 0182).
6. Install left engine access panel (WP 0184).
7. Install hood (WP 0186).
8. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0039-26