TM 5-2410-240-23-3
0289
Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch
and D6K Dozer with Ripper (Sheet 11 of 22).
0289
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
C
F
H
D
Group
Component/
Maintenance
Below
Tools and
Number
Assembly
Function
Crew
Maintainer
Depot
Depot
Equipment
Remarks
AC08
Battery Cables
Inspect
0.2
Test
0.5
2,3,17,43,
45,51,53,
54
Replace
2.0
51
AC09
0.2
Inspect
Junction Box
Test
0.5
2,17,51
Harness
Replace
1.0
51
AC10
Starter Cables
Inspect
0.2
Test
0.5
2,3,17,43,
45,51,53,
54
Replace
1.0
51
AC11
Junction Block
Inspect
0.2
Test
0.5
2,3,17,43,
51,53,54
Replace
0.5
51
AC12
Machine ECM
Test
0.3
2,3,17,43,
45,51,53,
54
Replace
1.0
51
Calibrate
0.3
51,53
AC13
Equipment ECM
Test
0.3
3,43,45,
51,53,54
Replace
0.3
51
Calibrate
0.3
51
AC14
Platform Wiring
Test
0.5
2,3,17,43,
Harness
45,51,53,
54,56
Replace
2.0
51,94
AC15
Horn Wiring
Test
0.5
51
Harness
Replace
0.5
51
0289-11