Home
Download PDF
Order CD-ROM
Order in Print
Figure 8. Valve Bank Cover Removal.
Figure 10. Winch Valve Removal.
Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
243
244
245
246
247
248
249
250
251
252
253
TM
5-2410-241-23-3
0212
DISASSEMBLY
CONTINUED
N OT E
Note
orientation
and
position
of O-rings to
aid
assembly.
5.
Remove
seven O-rings
(Figure
9,
Item
1)
from
cover
(Figure
9,
Item
2).
Discard O-rings.
.
Figure 9.
Cover
O-ring Removal.
0212
0212-9