TM 5-2410-240-23-1
0021
Table 1. Cab Troubleshooting Without Codes. - Continued.
0021
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
6. Front Flood Lamp(s) Will Not
Test Step 22. Test for Shorted
Work - Continued
608-GN Flood Lamp Relay #1
Front Flood Lamp #2.
1. Disassemble flood lamp (WP
0256).
for continuity (WP 0283)
lamp (WP 0256).
between bulb terminal 1 and
Proceed to Test Step 23.
bulb terminal 2 (Figure 44).
front flood lamp #2 (WP 0256).
Install LH (outer) front flood lamp
#1, RH (inner) front flood lamp #2,
and RH (outer) front flood lamp #1
on machine (WP 0256).
27) on flood lamp relay #1 (WP
For D6K Dozer with Ripper, install
ripper operation control handle
(WP 0218). For D6K Dozer with
Winch, install winch operation
control handle (WP 0217).
Figure 30) (WP 0201). Install three
new tiedown straps on fuse block
and circuit breaker panel wiring
harness and machine as noted
during removal.
Install fuse panel side cover on
machine (TM 5-2410-240-10).
Install new front flood lamp fuse on
fuse block.
Install fuse panel front cover on
machine (TM 5-2410-240-10).
Verify proper operation of flood
lamps (TM 5-2410-240-10).
0021-126