• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 22. Headrest Installation.
Figure 24. Cab Corner Bolts.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1188    1189    1190    1191    1192  1193  1194    1195    1196    1197    1198  
img
.
TM 5-2410-240-23-3
0284
INSTALLATION CONTINUED
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Ensure any lifting device used is in good condition and of
suitable load capacity. Keep clear of heavy parts supported only by lifting device. Failure
to follow this warning may cause injury or death to personnel.
N OT E
Cab upper section weighs approximately 750 lb (340 kg).
3. Attach slings and lifting device to cab upper section.
Figure 23. Slings and Lifting Device Attached to Cab.
0284
4. Raise cab upper section up and install on cab lower section.
0284-24


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.