Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch
and D6K Dozer with Ripper (Sheet 21 of 22).
0289
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
C
F
H
D
Group
Component/
Maintenance
Below
Tools and
Number
Assembly
Function
Crew
Maintainer
Depot
Depot
Equipment
Remarks
Winch
AF
Installation
AFA
Winch Assembly Test
0.5
2,3,17,32,
43,45,51,
53,54
Replace
2.5
51,53,
58,59
Repair
10.0
AFA01
Winch Cable
Inspect
0.2
Replace
1.0
51,53
AFAC
Winch Manifold
Test
0.5
2,3,17,32,
Block
43,45,51,
53,54
Replace
1.5
51
AFB
Winch Piston
Test
0.5
2,3,17,32,
Pump
43,45,51,
53,54,
Replace
3.5
40,51,53
Adjust
0.5
Ripper
BF
Installation
BF01
Ripper Carriage
Replace
4.0
51,53
Beam and
Linkage
BF02
Ripper Tooth
Inspect
0.2
51,53
Replace
0.3
51
BFA
Ripper Cylinder
Test
1.0
2,3,17,43,
45,51,53,
54
Repair
2.5
51,53,58
Replace
1.5
51,53,58
0289-21