TM 5-2410-240-23-3
0289
Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch
and D6K Dozer with Ripper (Sheet 16 of 22).
0289
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
C
F
H
D
Group
Component/
Maintenance
Below
Tools and
Number
Assembly
Function
Crew
Maintainer
Depot
Depot
Equipment
Remarks
AD08
Messenger
Test
1.0
2,3,17,43,
45,51,52,
53,54
Replace
0.2
51
AD09
Cab Fan and
Test
0.2
51
Bracket
Replace
0.3
51
AD10
Cab Fan Resistor Test
0.2
51
Replace
0.3
51
AD11
Power Converter Test
0.5
2,3,17,43,
45,51,52,
53,54
Replace
0.5
51
AD12
Winch Operation Test
1.0
2,3,17,32,
Control Handle
43,45, 51,
52,53,54
Replace
0.5
51,53
Calibrate
0.5
BD01
Ripper Operation Test
0.5
2,3,17,43,
Control Handle
45,51,52,
53,54
Replace
0.5
51,53
Calibrate
0.5
AD14
Headliner
Replace
0.8
51,53
AD15
Dash Panel
Replace
0.5
53
AD16
Instrument
Test
1.0
2,3,17,43,
Cluster
45,51,52,
53,54
51,53
Replace
0.2
AD17
Ignition Switch
Test
1.5
2,3,17,43,
45,53,54
Replace
0.2
51,53
0289-16