TM 5-2410-240-23-3
0289
Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch
and D6K Dozer with Ripper (Sheet 12 of 22).
0289
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
C
F
H
D
Group
Component/
Maintenance
Below
Tools and
Number
Assembly
Function
Crew
Maintainer
Depot
Depot
Equipment
Remarks
AC16
Accu-Grade
Replace
1.0
51
Ready Wiring
Harness
AC17
Fuel Tank Wiring Test
0.5
2,3,17,43,
Harness
45,51,53,
54
Replace
1.5
51
AC18
Bottom Guards
Replace
1.0
51
AC19
Angle and Tilt
Test
0.5
2,3,17,43,
Tubes
45,51,53,
54
Replace
1.0
51,53
AC20
Pilot Hoses
Test
0.5
2,3,17,43,
45,51,53,
54
Replace
1.2
51,53
AC21
Winch Pump
Test
0.5
2,3,17,32,
Hoses
43,45,51,
53,54
Replace
1.0
51,53
AC22
Winch Hoses
Test
0.5
2,3,17,32,
43,45,51,
53,54
Replace
4.0
51,53
AC23
Hydraulic
Service
0.3
System Pressure
Release
AC24
Hydraulic
Inspect
0.2
System Filter
Replace
1.0
53
Service
0289-12