TM 5-2410-240-23-3
0289
Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch
and D6K Dozer with Ripper (Sheet 10 of 22).
0289
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
C
F
H
D
Group
Component/
Maintenance
Below
Tools and
Number
Assembly
Function
Crew
Maintainer
Depot
Depot
Equipment
Remarks
ABH01
Hydrostatic
Test
0.5
2,3,17,43,
45,51,53,
Valve
54
Replace
1.0
51,53
ABJ
Hydrostatic Drive Test
0.5
2,3,13,17,
Piston Pumps
32,43,45,
51,53,54
Replace
51,53
5.0
Repair
8.0
Calibrate
0.5
CHASSIS
AC, BC
INSTALLATION
AC01
Test
0.5
2,3,17,43,
Harness
45,51,53,
54
Replace
1.0
51
AC02
Backup Alarm
Test
0.5
2,12,17,26,
51
Replace
0.3
51
AC03
Horn
Test
0.5
2,17,51
Replace
0.5
51,53,
59,61
AC04
Hydraulic Drive
Replace
1.0
51
AC05
Lockout Switch
Test
1.0
2,17,51
Replace
0.5
51
AC06
Battery
Inspect
0.2
Disconnect
Test
0.5
2,3,17,43,
Switch and
45,51,53,
Cables
54
Replace
2.0
51
AC07
Batteries
Inspect
0.2
Test
0.3
3,43,45,
51,53,54
Replace
1.0
51, 53
B
0289-10