• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch and D6K Dozer with Ripper (Sheet 8 of 22).
Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch and D6K Dozer with Ripper (Sheet 10 of 22).

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1230    1231    1232    1233    1234  1235  1236    1237    1238    1239    1240  
img
TM 5-2410-240-23-3
0289
Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch
and D6K Dozer with Ripper (Sheet 9 of 22).
0289
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
C
F
H
D
Group
Component/
Maintenance
Below
Tools and
Number
Assembly
Function
Crew
Maintainer
Depot
Depot
Equipment
Remarks
ABCA
Right Track
Inspect
51,53,57
0.2
Adjuster and
Repair
4.0
51,57
Spring Assembly Adjust
2.0
A
ABCB
Right Idler
Repair
2.0
51
Assembly
Replace
4.0
3.0
7,8,27,51,
ABD
Final Drive
Replace
Assembly
53,68
Repair
10.0
ABD01
Brake Assembly
Inspect
0.2
Replace
2.0
10,28,36,
39,46,51,
53,69,70,
71,72,73,
74,75,76,
77
0.2
ABE
Hydraulic Fan
Inspect
0.5
2,3,17,43,
Test
Gear Pump
45, 51, 53,
54
Replace
2.0
51,53
ABEA
Implement Pump Test
4.0
2,3,13,17,
43,45,51,
53,54
Replace
1.5
51
Repair
6.0
ABF
Right Hydrostatic Replace
2.0
51,53
Drive Motor
Repair
6.0
ABF01
Hydrostatic Drive Replace
0.3
51
Motor Solenoid
2.0
51, 53
ABG
Left Hydrostatic
Repair
Replace
6.0
Drive Motor
ABG01
Hydrostatic Drive Replace
0.3
51
Motor Solenoid
ABH
Transmission
Repair
2.0
Control Valve
Replace
2.5
51,53,57
0289-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.