• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch and D6K Dozer with Ripper (Sheet 7 of 22).
Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch and D6K Dozer with Ripper (Sheet 9 of 22).

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1229    1230    1231    1232    1233  1234  1235    1236    1237    1238    1239  
img
TM 5-2410-240-23-3
0289
Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch
and D6K Dozer with Ripper (Sheet 8 of 22).
0289
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
C
F
H
D
Group
Component/
Maintenance
Below
Tools and
Number
Assembly
Function
Crew
Maintainer
Depot
Depot
Equipment
Remarks
AB04
Oil Cooler Hoses Replace
1.0
51,53
AB05
Hydrostatic
Replace
1.0
51
Hoses
AB06
Sprocket
Inspect
0.2
Segment
Replace
2.0
51,57
AB07
Hydraulic
Replace
0.3
51
Control Manifold
Solenoid
AB08
Hydraulic Pump
Replace
1.0
51
Solenoid Valve
AB09
Rear Engine
Replace
2.0
51,53,
Mounts
57,58
AB10
Track Roller
Replace
2.0
51
Frame Covers
and Guards
ABA
Track Assembly
Inspect
0.2
51,53,23
Replace
8.0
27,51,
53,58
Repair
6.0
Adjust
1.0
51,53
ABB
Left Track Roller Replace
2.0
51,53,58
Frame Assembly
Repair
6.0
ABB01
Left Track Roller Replace
2.0
51,57
51,53,57
0.2
ABBA
Left Track
Inspect
Repair
4.0
51,57
Adjuster and
Spring Assembly Adjust
2.0
A
ABBB
Left Idler
Replace
2.0
51
Assembly
Repair
4.0
ABC
Right Track
Replace
2.0
51,53,58
Roller Frame
Repair
6.0
Assembly
ABC01
Right Track
Replace
2.0
51,57
Roller
0289-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.