TM 5-2410-240-23-3
0289
Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch
and D6K Dozer with Ripper (Sheet 6 of 22).
0289
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
C
F
H
D
Group
Component/
Maintenance
Below
Tools and
Number
Assembly
Function
Crew
Maintainer
Depot
Depot
Equipment
Remarks
AAA28
Inspect
0.2
Assembly
Test
0.3
2,3,17,43,
45,51,53,
54,57
Replace
1.0
51,53,57
AAA29
0.2
Test
0.3
2,17,37,51,
52,53,54,
59
Replace
1.0
37,51,53,
59
AAA30
Pulley, Hub, and Inspect
0.2
Damper
Test
0.5
2,3,4,14,
17,43,45,
47,48,51,
53
Replace
1.0
51,57
AAA31
Front Oil Seal
Inspect
0.2
Replace
4.0
19,20,53,
64
AAA32
Pump Coupling
Replace
0.5
51,53,57
AAA33
Starter Motor
Inspect
0.2
Test
0.3
2,3,17,43,
45,51,53,
54,57,61
Replace
1.5
51,57
AAA34
Flywheel
Replace
0.5
8,51,53,56,
Assembly
57,94
AAA35
Flywheel
Test
0.5
2,3,4,14,
Housing
17,43,45,
47,48,51,
53
Replace
1.0
8,51,53,57,
59
0289-6