• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch and D6K Dozer with Ripper (Sheet 14 of 22).
Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch and D6K Dozer with Ripper (Sheet 16 of 22).

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1236    1237    1238    1239    1240  1241  1242    1243    1244    1245    1246  
img
TM 5-2410-240-23-3
0289
Table 1. Maintenance Allocation Chart (MAC) for D6K Dozer with Winch
and D6K Dozer with Ripper (Sheet 15 of 22).
0289
(1)
(2)
(3)
(4)
(5)
(6)
Maintenance Level
Field
Sustainment
C
F
H
D
Group
Component/
Maintenance
Below
Tools and
Number
Assembly
Function
Crew
Maintainer
Depot
Depot
Equipment
Remarks
BCC01
Valve Bank
Test
0.5
2,17,51
Solenoid Valve
Replace
3.0
51,53
(with Ripper)
2,17,51
0.5
ACD
Demand Fan
Test
1.5
Manifold
Repair
1.5
51,53
Replace
2,17,51
0.5
ACD01
Demand Fan
Test
51,53
0.2
Replace
Manifold
0.5
Calibrate
Solenoid Valve
2,17,51
0.5
ACE
Main and
Test
51
1.0
Alternator Circuit Replace
Breaker
Replace
1.0
51
ACE01
Fuse Block and
Circuit Breaker
Panel Wiring
Harness
AD, BD
Cab Installation
AD01
A/C Condenser
Inspect
0.2
Assembly
Test
0.5
2,17,51,52,
53,54
Replace
2.0
40,51,53
AD02
Front Floor
Replace
0.5
51
Plates
AD03
Rear Floor Plate
Replace
0.5
51
Test
1.0
2,3,17,43,
AD04
Wiper Motor,
45, 51,52,
Wiper Arm, and
53,54
Wiper Blade
Replace
1.0
51,53,
59,61
AD05
Cab Glass
Replace
1.0
51,53
AD06
Rifle Bracket
Replace
0.5
51
AD07
Cab Trim
Replace
1.5
51,53
0289-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.