TM 5-2410-241-23-1
0020
Table 1. Powertrain Troubleshooting Procedures - Continued.
0020
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
681-5 Parking Brake Sole-
9. Disconnect powertrain ECM con-
noid Voltage Below Nor-
mal - Continued
from the powertrain ECM.
10. Disconnect powertrain ECM con-
from the powertrain ECM.
11. Disconnect platform harness con-
33) from steering control harness
Figure 34).
1.
If continuity is NOT found, proceed
0296), test for continuity between
to step 13.
pin 3 on powertrain ECM connec- 2.
If continuity is found, replace
steering control harness (WP
all pins in powertrain ECM connec-
0178). Ensure all harness connec-
tors are reconnected. Verify cor-
rect operation of machine (TM 5-
2410-241-10).
1.
If continuity is NOT found, proceed
0296), test for continuity between
to step 14.
pin 3 on powertrain ECM connec- 2.
If continuity is found, replace
steering control harness (WP
all pins in powertrain ECM connec-
0178). Ensure all harness connec-
tors are reconnected. Verify cor-
the powertrain ECM.
rect operation of machine (TM 5-
2410-241-10).
1. If continuity is found, proceed to
0296), test for continuity between
step 15.
pin 3 on powertrain ECM connec-
steering control harness (WP
pin 33 on steering control harness
0178). Ensure all harness connec-
tors are reconnected. Verify cor-
Figure 34).
rect operation of machine (TM 5-
2410-241-10).
1. If continuity is found, proceed to
0296), test for continuity between
step 16.
pin 4 on powertrain ECM connec-
steering control harness (WP
pin 7 on steering control harness
0178). Ensure all harness connec-
tors are reconnected. Verify cor-
Figure 34).
rect operation of machine (TM 5-
2410-241-10).
0020-130