• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 18. Fresh Air Intake Cover.
ENGINE ENCLOSURE LEFT DOOR SERVICE

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  57    58    59    60    61  62  63    64    65    66    67  
img
. . .
TM 5-2410-241-23-3
0200
INSTALLATION CONTINUED
13. Install two plates (Figure 19, Item 5), spacers (Figure 19, Item 2), washers (Figure 19, Item 3), bolts (Figure 19,
Item 4), and new locknuts (Figure 19, Item 1) on hood (Figure 19, Item 6).
Figure 19. Plate.
0200
END OF TASK
FOLLOW-ON TASKS
000200
1. Install engine access doors (WP 0201 and WP 0203).
2. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0200-13/(14 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.