• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 11. Striker Plate.
Figure 13. Left Door Assembly.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  69    70    71    72    73  74  75    76    77    78    79  
img
.
TM 5-2410-241-23-3
0201
INSTALLATION CONTINUED
2. Install hinge plate (Figure 12, Item 3), four washers (Figure 12, Item 2), and bolts (Figure 12, Item 1) on
machine.
Figure 12. Hinge Plate.
0201
0201-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.