TM 5-2410-241-23-3
0211
CLEANING AND INSPECTION
000211
N OT E
After cleaning, allow parts to air dry. Do not use rags, as rags may cause lint to be
deposited on parts. Perform cleaning, inspection, and assembly on a clean surface.
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
ASSEMBLY
000211
N OT E
Install valve as noted during removal.
Install O-rings as noted during disassembly.
1. Install two new O-rings (Figure 14, Item 4) on relief valve (Figure 14, Item 3).
2. Install relief valve (Figure 14, Item 3) on valve cap (Figure 14, Item 2).
3. Install three rods (Figure 14, Item 1) on valve cap (Figure 14, Item 2).
4. Install seven new O-rings (Figure 13, Item 2) on valve (Figure 13, Item 1).
5. Install valve (Figure 13, Item 1) on valve cap (Figure 13, Item 3).
0211-15