• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Seat Suspension Mounting.
Figure 2. Interior Door Handle.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  572    573    574    575    576  577  578    579    580    581    582  
img
. . . . . . . . . .
22
TM 5-2410-241-23-3
0249
FIELD MAINTENANCE INSTRUCTIONS
-
DOOR ASSEMBLY REPLACEMENT
0249
Door Removal, Door Glass Removal, Door Disassembly, Cleaning and Inspection, Door Assembly, Door
Glass Installation, Door Installation
INITIAL SETUP
Tools and Special Tools
Personnel Required
0
0
Tool Kit, General Mechanic's
Two
0
(WP 0302, Item 65)
0
References
0
Screwdriver Attachment, Torx 3/8" Drive,
WP 0250
0
T-30 (S0288) (WP 0302, Item 68)
0
WP 0295
0
Materials/Parts
0
Equipment Condition
0
Rag, Wiping (WP 0303, Item 24)
0
Machine parked (TM 5-2410-241-10)
0
Tag, Marker (WP 0303, Item 34)
0
Detergent, General Purpose, Liquid
Drawing Required
0
(WP 0303, Item 8)
0
TM 5-2410-241-24P, Figure 112, 113, 114
0
Seal (Foam)
0
Estimated Time to Complete
0
Seal (Rubber)
0
2.5 Hr
0
N OT E
This procedure covers one door. Follow same procedure for other door.
DOOR REMOVAL
000249
1. Loosen two setscrews (Figure 1, Item 1) and remove door lock handle (Figure 1, Item 2) from machine.
Figure 1. Door Lock.
0249
0249-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.