0497-03 Blade Tilt Right
Test Step 2. Test M928-BU Blade
Solenoid Voltage Above Nor- Tilt Right Solenoid Circuit for Short
mal - Continued
to Other Circuits in Platform Wiring
Harness.
1. Turn ignition switch and battery
disconnect switch to OFF position
(TM 5-2410-240-10).
2. Disconnect platform wiring har-
Figure 217) from ECM J1: with
Ripper (WP 0147); with Winch
(WP 0149).
3. Disconnect platform wiring har-
Figure 218) from ECM J2: with
Ripper (WP 0147); with Winch
(WP 0149).
4. Disconnect platform wiring har-
Figure 215) from equipment ECM
(WP 0148).
No Continuity on Any Test Points -
0283), test for continuity between
Proceed to step 6.
PL-C4 terminal 61 and all other
Points - Replace platform wiring har-
ure 217).
ness: with Ripper (WP 0150); with
Winch (WP 0155).
Proceed to step 8.
No Continuity on Any Test Points -
0283), test for continuity between
Proceed to step 7.
ure 217) and all circuits in PL-C5
Points - Replace platform wiring har-
ness: with Ripper (WP 0150); with
Winch (WP 0155).
Proceed to step 8.
No Continuity on Any Test Points -
0283), test for continuity between
Proceed to Test Step 3.
ure 217) and all circuits in PL-C2
Points - Replace platform wiring har-
ness: with Ripper (WP 0150); with
Winch (WP 0155).
Proceed to step 8.