Figure 1. Lockout Switch Access Panel, Hinge, and Retaining Hardware.
RIGHT REAR ACCESS PANEL REPLACEMENT

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  135    136    137    138    139  140  141    142    143    144    145  
img
.
TM 5-2410-240-23-3
0189
CLEANING AND INSPECTION
000189
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0282).
END OF TASK
INSTALLATION
000189
1. Position hinge (Figure 2, Item 2), and install two washers (Figure 2, Item 3) and nuts (Figure 2, Item 4) on right
rear access panel (Figure 2, Item 1).
2. Install lockout switch access panel (Figure 1, Item 1) and two washers (Figure 1, Item 2) on hinge (Figure 1,
Item 3).
3. Loosely install two nuts (Figure 1, Item 4) retaining lockout switch access panel (Figure 1, Item 1) on hinge
(Figure 1, Item 3).
4. Close and adjust access door (Figure 1, Item 1) on hinge (Figure 1, Item 3).
5. Open access door (Figure 1, Item 1) and tighten two nuts (Figure 1, Item 4).
6. Close access door (Figure 1, Item 1).
END OF TASK
END OF WORK PACKAGE
0189-3/(4 blank)