• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 17. Heater, A/C Duct Hose.
Figure 19. Left C-Pillar.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  369    370    371    372    373  374  375    376    377    378    379  
img
.
TM 5-2410-240-23-3
0212
RIGHT C-PILLAR INSTALLATION
000212
NOTE
Install electrical connectors as tagged during removal.
Install right C-pillar (Figure 18, Item 3) on cab with four screws (Figure 18, Item 1) and washers (Figure 18, Item 2).
Figure 18. Right C-Pillar.
0212
END OF TASK
0212-17


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.