• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Hose Routing through Battery Compartment.
Figure 12. Hose in Door Routing.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  464    465    466    467    468  469  470    471    472    473    474  
img
.
TM 5-2410-240-23-3
0226
INSTALLATION CONTINUED
N OT E
Install hoses as noted during removal.
Install tiedown straps as noted during removal.
4. Install hose (Figure 11, Item 2) and new three tiedown straps (Figure 11, Item 3, 4, 5) in battery compartment.
5. From battery compartment, install new hose (Figure 11, Item 2) through frame (Figure 11, Item 1).
Figure 11. Hose in Battery Compartment.
0226
0226-11


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.