• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 19. Arctic Battery Cable Clamps Installation at Fuel Filter Housing.
Figure 22. Positive Arctic Battery Terminal Installation (Left Battery).

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1079    1080    1081    1082    1083  1084  1085    1086    1087    1088    1089  
img
.
TM 5-2410-240-23-3
0276
INSTALLATION CONTINUED
N OT E
Install battery cable as noted during removal.
11. Install positive arctic battery cable (Figure 20, Item 1), washer (Figure 20, Item 3), and positive arctic battery
terminal nut (Figure 20, Item 2) on battery terminal (Figure 20, Item 4).
Figure 20. Arctic Battery Positive Terminal Installation.
0276
12. Install positive arctic battery terminal cover (Figure 21, Item 3) over positive arctic battery cable
(Figure 21, Item 1).
N OT E
Install tiedown strap as noted during removal.
13. Install new tiedown strap (Figure 21, Item 2) on positive arctic battery terminal cover (Figure 21, Item 3).
Figure 21. Arctic Battery Positive Terminal Cover Installation.
0276
0276-19


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.