• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 20. Arctic Battery Positive Terminal Installation.
Figure 23. Positive Arctic Battery Terminal Installation (Right Battery).

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1080    1081    1082    1083    1084  1085  1086    1087    1088    1089    1090  
img
.
TM 5-2410-240-23-3
0276
INSTALLATION CONTINUED
N OT E
Install battery cable as noted during removal.
14. Install positive arctic battery terminal (Figure 22, Item 3) and tighten positive arctic battery terminal nut
(Figure 22, Item 2) on left arctic battery (Figure 22, Item 1).
15. Lower positive arctic battery terminal cover (Figure 22, Item 4) over positive arctic battery terminal (Figure 22,
Item 3).
Figure 22. Positive Arctic Battery Terminal Installation (Left Battery).
0276
0276-20


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.