• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Arctic Heater Switch and Guard.
Figure 8. Harness Routing Right Side.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1091    1092    1093    1094    1095  1096  1097    1098    1099    1100    1101  
img
.
TM 5-2410-240-23-3
0277
N OT E
Install tiedown straps as noted during removal.
Connect electrical connectors as noted during removal.
INSTALLATION
000277
1. Install switch guard (Figure 6, Item 1) and arctic heater switch (Figure 6, Item 2) in control panel
(Figure 6, Item 3).
Figure 6. Arctic Heater Switch and Guard.
0277
2. Install arctic heater switch connector (Figure 7, Item 3) and wires (Figure 7, Item 1) through grommet (Figure 7,
Item 2).
Figure 7. Right Console.
0277
0277-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.