TM 5-2410-240-23-3
0278
ARCTIC HEATER INSTALLATION CONTINUED
10. Open fuel shutoff valve (Figure 12, Item 1).
0278
END OF TASK
FOLLOW-ON TASKS
000278
4. Fill engine with coolant (WP 0043).
5. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE