• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
OPERATION IN SNOW AND ON ICE CONTINUED
Figure 2. Front Towing Eye.

Operators Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  74    75    76    77    78  79  80    81    82    83    84  
img
TM 5-2410-241-10
0006
RECOVERY AND TOWING (OPERATIONAL MACHINE)
0006
WARN I N G
Ensure recovery line is strong enough (has a rated capacity of 150% of gross weight of
the towed machine) and is in good condition.
Attach recovery line only to towing connection points provided on frame.
DO NOT have tension on the recovery line when inspecting it.
DO NOT jerk on recovey line; it may break.
r
C AU T I O N
Recovery of a disabled machine with engine stopped may cause transmission damage.
Transmission will not have lubrication.
If further evacuation is necessary, notify Field Maintenance to tow or haul machine to
convenient location for repairs.
N OT E
Towing a non-operational machine must be performed by Field Maintenance.
0006-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.