• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 22. ECM Connection.
Figure 24. Harness and Bracket.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  20    21    22    23    24  25  26    27    28    29    30  
img
.
TM 5-2410-241-23-2
0057
INSTALL ENGINE ON STAND CONTINUED
N OT E
Tag and mark all cables to aid installation.
9. Remove bolt (Figure 23, Item 7), washer (Figure 23, Item 6), clamp (Figure 23, Item 8), receiver/dryer (Figure
23, Item 9) and spacer (Figure 23, Item 5) from engine.
10. Remove bolt (Figure 23, Item 4), washer (Figure 23, Item 3), and clamp (Figure 23, Item 1). Position NATO
slave cables (Figure 23, Item 2) aside.
Figure 23. Receiver/Dryer.
0057
0057-25


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.