Figure 14. Right Pump Drive Gear.
Figure 17. O-ring on Left Side of Flywheel Housing.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  315    316    317    318    319  320  321    322    323    324    325  
img
.
TM 5-2410-241-23-2
0085
INSTALLATION CONTINUED
10. Install new O-ring (Figure 15, Item 2) on flywheel housing (Figure 15, Item 1).
Figure 15. O-ring on Right Side of Flywheel Housing.
0085
11. Install cover (Figure 16, Item 4), two washers (Figure 16, Item 2), and bolts (Figure 16, Item 3) on flywheel
housing (Figure 16, Item 1). Tighten bolts to 177 30 lb-ft (240 40 Nm).
Figure 16. Cover and Retaining Hardware on Right Side of Flywheel
Housing.
0085
0085-14