• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Track Roller.
Figure 4. Front and Rear Support.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  628    629    630    631    632  633  634    635    636    637    638  
img
.
TM 5-2410-241-23-2
0132
INSTALLATION
000132
WARN I N G
Use extreme caution when handling heavy parts. Provide adequate support and use
assistance during procedure. Ensure any lifting device used is in good condition and of
suitable load capacity. Keep clear of heavy parts supported only by lifting device. Failure
to follow this warning may cause injury or death to personnel.
N OT E
Bulldozer weighs approximately 67,000 lb (30,390 kg).
Track roller weighs approximately 150 lb (68 kg).
This procedure is for one track roller. Use same procedure for remaining track rollers.
1. Using lifting device and roller lifting fork, install track roller (Figure 3, Item 1), four washers (Figure 3, Item 3),
and bolts (Figure 3, Item 4) on track frame (Figure 3, Item 2). Tighten bolts to 391 lb-ft (530 Nm).
2. Remove lifting device and roller lifting fork from track roller (Figure 3, Item 1).
Figure 3. Track Roller.
0132
0132-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.