TM 5-2410-241-23-2
0132
INSTALLATION CONTINUED
3. Using lifting device, raise rear of machine (Figure 4, Item 4) and remove two wooden blocks (Figure 4, Item 3).
Lower rear of machine.
4. Using lifting device, raise front of machine (Figure 4, Item 2) and remove jack stand (Figure 4, Item 1). Lower
front of machine.
Figure 4. Front and Rear Support.
0132
END OF TASK
FOLLOW-ON TASKS
000132
1. Adjust track tension (WP 0127).
2. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE