• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Sprocket Segment.
BRAKE AND PLANETARY ASSEMBLY SERVICE

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  667    668    669    670    671  672  673    674    675    676    677  
img
TM 5-2410-241-23-2
0137
INSTALLATION
000137
N OT E
This procedure will install one sprocket segment. Follow same procedure for additional
sprocket segments.
1. Install five washers (Figure 1, Item 4) and bolts (Figure 1, Item 5) on final drive (Figure 1, Item 1).
2. Install sprocket segment (Figure 1, Item 2) and five nuts (Figure 1, Item 3) on final drive (Figure 1, Item 1).
3. Tighten nuts (Figure 1, Item 3) to 221 lb-ft (300 Nm).
4. Tighten nuts (Figure 1, Item 3) an additional 1/3 turn.
5. Check torque on nuts (Figure 1, Item 3). Minimum torque on nuts is 420 lb-ft (570 Nm).
END OF TASK
FOLLOW-ON TASKS
000137
Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0137-3/(4 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.