FIELD MAINTENANCE
-
BRAKE AND PLANETARY ASSEMBLY SERVICE
0
138
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Tools and Special Tools
Materials/Parts
0
0
Tool Kit, General Mechanic's
Rag, Wiping (WP 0303, Item 24)
0
(WP 0302, Item 65)
0
Bolt (3/4 in. x 10 x 5 1/2) (2)
0
Bracket, Link (3/8 in.; 2,250 lb [1,000 kg])
Bolt (5/8 in. x 10 x 2) (3)
0
(WP 0302, Item 10)
0
Nut (3/4 in. x 10) (2)
0
Bracket, Link (1-1/4 in.; 9,000 lb [4,000 kg])
O-ring (3)
0
0
(WP 0302, Item 12)
Washer (3/4) (4)
0
Extension, 3/4" Drive, 4" Long (S3076)
Personnel
(WP 0302, Item 68)
0
0
Handle, Ratchet, 3/4" Drive, 17" Long (S0375)
Two
0
(WP 0302, Item 68)
0
References
0
Lifting Bracket (WP 0302, Item 75)
0
WP 0295
0
Shackle, 1" (WP 0302, Item 52)
0
Socket, 3/4" Drive, 12 Point, 1 1/8" (S0385)
Equipment Condition
0
0
(WP 0302, Item 68)
Machine parked (TM 5-2410-241-10)
0
Socket, Impact 3/4" Drive, 6 Point
0
0
1-1/8" (S0972) (WP 0302, Item 68)
0
Wrench, Combination, 1 1/8" (S0788) (WP
0
0302, Item 68)
0
ROPS removed (WP 0225)
0
Wrench, Electric Impact, 3/4" Square Drive,
1,200 lb-ft (S0730) (WP 0302, Item 68)
0
Drawing Required
0
Wrench, Torque, Click, Ratcheting, 3/4" Drive,
TM 5-2410-241-24P, Figure 65
0
600 lb-ft (WP 0302, Item 72)
0
Lifting Device (2,000-lb capacity)
0
Estimated Time to Complete
0
7.0 Hr