• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Outlet Relief Valve.
Figure 10. Headliner.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  769    770    771    772    773  774  775    776    777    778    779  
img
.
TM 5-2410-241-23-2
0148
REMOVAL CONTINUED
N OT E
Note location of tiedown sraps to aid installation.
t
Tag wiring harness to aid installation.
22. Remove tiedown straps (Figure 8, Item 1) from harness (Figure 8, Item 2). Discard tiedown straps.
23. Disconnect connector (Figure 8, Item 8) from temperature sensor (Figure 8, Item 9).
24. Disconnect connector (Figure 8, Item 3) from speed sensor (Figure 8, Item 7).
25. Position harness (Figure 8, Item 2) aside.
26. Remove bolt (Figure 8, Item 4), washer (Figure 8, Item 5), and bracket (Figure 8, Item 6) from torque converter
housing (Figure 8, Item 10).
Figure 8. Wiring Harness.
0148
0148-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.