• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Hose.
Figure 3. Tube to Torque Converter Housing.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  764    765    766    767    768  769  770    771    772    773    774  
img
.
TM 5-2410-241-23-2
0148
REMOVAL CONTINUED
N OT E
Tag tubes to aid installation.
4. Remove four bolts (Figure 2, Item 5), washers (Figure 2, Item 6), and two flanges (Figure 2, Item 7) from lower
transmission cooler tube (Figure 2, Item 4).
N OT E
Clearance does not allow bolts to remove from tube. Bolts will be removed with tube.
5. Loosen four bolts (Figure 2, Item 1) and washers (Figure 2, Item 2) from upper transmission cooler tube
(Figure 2, Item 3).
6. Loosen upper transmission cooler tube (Figure 2, Item 3) and lower transmission cooler tube (Figure 2, Item 4)
from transmission oil cooler (Figure 2, Item 8).
Figure 2. Transmission Cooler Tubes.
0148
0148-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.