• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Secondary Brake Parking Valve and First Coil.
Figure 8. Control Valve Harness.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  760    761    762    763    764  765  766    767    768    769    770  
img
.
TM 5-2410-241-23-2
0147
INSTALLATION CONTINUED
4. Install O-rings (Figure 6, Item 2) and O-ring (Figure 6, Item 3) on spool assembly (Figure 6, Item 4).
5. Install spool assembly (Figure 6, Item 4) on manifold (Figure 6, Item 1). Tighten spool to 37 lb-ft (50 Nm).
6. Install coil (Figure 6, Item 7), washer (Figure 6, Item 6), and nut (Figure 6, Item 5) on spool assembly (Figure 6,
Item 4). Tighten nut to 85 lb-in. (9.5 Nm).
Figure 6. Solenoid Valve.
0147
7. Install four new O-rings (Figure 7, Item 2) on control valve (Figure 7, Item 1).
Figure 7. Control Valve Seals.
0147
0147-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.