• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Secondary Brake Parking Valve and First Coil.
Figure 6. Solenoid Valve.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  759    760    761    762    763  764  765    766    767    768    769  
img
.
TM 5-2410-241-23-2
0147
INSTALLATION
000147
1. Install new O-ring (Figure 5, Item 3) and new O-ring (Figure 5, Item 4) on two spool assemblies (Figure 5,
Item 2).
2. Install two spool assemblies (Figure 5, Item 2) on manifold (Figure 5, Item 1). Tighten spool to 37 lb-ft (50 Nm).
3. Install two coils (Figure 5, Item 7), washers (Figure 5, Item 5), and nuts (Figure 5, Item 6) on spool assembly
(Figure 5, Item 2). Tighten nut to 85 lb-in. (9.5 Nm).
.
Figure 5. Secondary Brake Parking Valve and First Coil.
0147
0147-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.