• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Steering Motor.
Figure 7. Hydraulic Tank.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1184    1185    1186    1187    1188  1189  1190    1191    1192    1193    1194  
img
.
TM 5-2410-241-23-2
0195
INSTALLATION
000195
N OT E
Install hose as noted during removal.
1. Install two spring tension clips (Figure 6, Item 1), hose (Figure 6, Item 4), washer (Figure 6, Item 2), and bolt
(Figure 6, Item 3) on machine.
2. Install new O-ring (Figure 6, Item 5) on tee (Figure 6, Item 6).
3. Connect hose (Figure 6, Item 4) to tee (Figure 6, Item 6).
Figure 6. Steering Motor.
0195
0195-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.