• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Latch Assembly.
Figure 12. Hinge Plate.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  90    91    92    93    94  95  96    97    98    99    100  
img
.
TM 5-2410-241-23-3
0203
INSTALLATION
000203
1. Install striker plate (Figure 11, Item 1), three washers (Figure 11, Item 3), and bolts (Figure 11, Item 2) on
machine.
Figure 11. Striker Plate.
0203
0203-11


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.