INSTALLATION CONTINUED
N OT E
Install harness as noted during removal.
Install connectors and cables as tagged and marked during removal.
Install tiedown straps as noted during removal.
20. Install new tiedown straps (Figure 26, Item 6) on harness (Figure 26, Item 5) and platform (Figure 26, Item 9).
21. Install five ground cables (Figure 26, Item 4), two washers (Figure 26, Item 3), and bolts (Figure 26, Item 2) on
platform (Figure 26, Item 9).
22. Connect connector (Figure 26, Item 7) and tighten bolt (Figure 26, Item 8) on platform (Figure 26, Item 9).
Figure 26. Platform Harness to Instrument Panel Harness Connector.