• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 29. Right Side Harness Routing.
CYLINDER FLOOD LAMP AND BRACKET SERVICE

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  196    197    198    199    200  201  202    203    204    205    206  
img
. .
TM 5-2410-241-23-3
0209
INSTALLATION CONTINUED
N OT E
Install harness as noted during removal.
Install connectors as tagged and marked during removal.
Install tiedown straps as noted during removal.
29. Install new tiedown straps (Figure 30, Item 2) on harness (Figure 30, Item 6) and platform (Figure 30, Item 1).
30. Install three connectors (Figure 30, Item 5), six washers (Figure 30, Item 3), and bolts (Figure 30, Item 4) on
platform (Figure 30, Item 1).
Figure 30. Right Rear Harness Routing.
0209
END OF TASK
FOLLOW-ON TASKS
000209
1. Install platform (WP 0207).
2. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0209-26


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.