• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 18. Dash Electrical Connectors.
PILOT VALVE BULLDOZER SERVICE

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  683    684    685    686    687  688  689    690    691    692    693  
img
.
TM 5-2410-241-23-3
0258
INSTALLATION CONTINUED
12. Close dash and install four screws (Figure 20, Item 1), two washers (Figure 20, Item 4), and bolts (Figure 20,
Item 3) on instrument panel (Figure 20, Item 2).
Figure 20. Instrument Panel.
0258
END OF TASK
FOLLOW-ON TASKS
000258
1. Adjust brake pedal (WP 0037).
2. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0258-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.