• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Hoses and Pilot Valve.
Figure 4. Handle.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  686    687    688    689    690  691  692    693    694    695    696  
img
.
TM 5-2410-241-23-3
0259
REMOVAL CONTINUED
2. Remove four bolts (Figure 2, Item 2) and washers (Figure 2, Item 3) from base plate (Figure 2, Item 1).
Figure 2. Retainer Plate.
0259
N OT E
Tag electrical connectors to aid installation.
3. Pull pilot valve and hand control assembly (Figure 3, Item 3) away from plate (Figure 3, Item 2) and disconnect
electrical connector (Figure 3, Item 1).
4. Remove pilot valve and hand control assembly (Figure 3, Item 3) from machine.
Figure 3. Electrical Connector.
0259
0259-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.