• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Arctic Kit Troubleshooting Procedures for the D7R Dozer - Continued.
ARCTIC KIT BATTERY CABLES REMOVAL

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  900    901    902    903    904  905  906    907    908    909    910  
img
. . . . . . . . . .
20
TM 5-2410-241-23-3
0287
FIELD MAINTENANCE
-
ARCTIC KIT BATTERY CABLES AND JUNCTION BLOCK POWER CABLE REPLACEMENT
028
7
Arctic Kit Battery Cables Removal, Arctic Kit Junction Block Power Cable Removal, Cleaning and
Inspection, Arctic Kit Junction Block Power Cable Installation, Arctic Kit Battery Cables Installation
INITIAL SETUP
Personnel Required
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Two
0
(WP 0302, Item 65)
Equipment Condition
0
0
Gloves, Rubber (S0208)
Machine parked (TM 5-2410-241-10)
(WP 0302, Item 68)
0
0
Battery ground cable disconnected from bat-
Goggles (S0209)
teries (WP 0160)
(WP 0302, Item 68)
0
0
Drawing Required
Materials/Parts
0
0
TM 5-2410-241-24P, Figure 96, 154
Detergent, General Purpose, Liquid
0
(WP 0303, Item 8)
Estimated Time to Complete
0
0
Rag, Wiping (WP 0303, Item 24)
0
1.0 Hr
0
Tag, Marker (WP 0303, Item 34)
0
References
0
WP 0230
0
WP 0295
0
0287-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.