• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Positive and Negative Arctic Kit Battery Cables.
Figure 6. Negative Battery Cables at Disconnect Switch.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  905    906    907    908    909  910  911    912    913    914    915  
img
.
TM 5-2410-241-23-3
0287
ARCTIC KIT BATTERY CABLES REMOVAL CONTINUED
12. Position positive cable cover (Figure 5, Item 2) aside.
N OT E
Note cable routing to aid installation.
Tag and mark all cables to aid installation.
13. Remove nut (Figure 5, Item 3), positive cable (Figure 5, Item 1), and positive arctic kit battery cable (Figure 5,
Item 4) from terminal (Figure 5, Item 8).
14. Remove two grommets (Figure 5, Item 5) from arctic kit battery box (Figure 5, Item 6) and battery box
(Figure 5, Item 7).
15. Remove positive arctic kit battery cable (Figure 5, Item 4) from machine.
Figure 5. Positive Battery Cables at Terminal.
0287
0287-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.