• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Arctic Kit Positive Battery Cables at Junction Block.
Figure 11. Arctic Kit Positive Battery Cable at Terminal.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  910    911    912    913    914  915  916    917    918    919    920  
img
. .
TM 5-2410-241-23-3
0287
ARCTIC KIT JUNCTION BLOCK POWER CABLE INSTALLATION
000287
N OT E
Route cables as noted during removal.
Remove tags and install electrical connecions and cables as noted during removal.
t
1. Install arctic kit junction block positive cable (Figure 10, Item 1) on machine.
2. Install arctic kit junction block positive cable (Figure 10, Item 1), positive cable (Figure 10, Item 4), washer
(Figure 10, Item 5), and nut (Figure 10, Item 2) on junction block (Figure 10, Item 6).
3. Position positive cable cover (Figure 10, Item 3) over nut (Figure 10, Item 2).
4. Install front floor plates (WP 0230).
Figure 10. Arctic Kit Positive Battery Cables at Junction Block.
0287
0287-11


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.