TM 5-2410-241-23-3
0291
INSTALLATION CONTINUED
28. Turn fuel valve (Figure 12, Item 1) to ON position.
Figure 12. Arctic Kit Heater Fuel Shutoff.
0291
END OF TASK
FOLLOW-ON TASKS
1. Fill cooling system (WP 0113).
2. Install ether bottle valve and bracket (WP 0060).
3. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE