• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 35. Arctic Kit Heater Battery Connections.
Figure 37. Arctic Kit Heater Battery Box Cover.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1032    1033    1034    1035    1036  1037  1038    1039    1040    1041    1042  
img
.
TM 5-2410-241-23-3
0297
ARCTIC KIT HEATER BATTERY BOX INSTALLATION CONTINUED
10. Remove two nuts (Figure 36, Items 2 and 5), washers (Figure 36, Items 3 and 4), and cables (Figure 36,
Items 8 and 12) from stud (Figure 36, Item 11) and junction block (Figure 36, Item 9).
11. Install positive cable (Figure 36, Item 10) onto stud (Figure 36, Item 11), reinstall arctic heater cable (Figure 36,
Item 12), and install washer (Figure 36, Item 3) and nut (Figure 36, Item 2).
12. Install negative cables (Figure 36, Items 7 and 8) on junction block (Figure 36, Item 9) and install washer
(Figure 36, Item 4) and nut (Figure 36, Item 5).
13. Reposition covers (Figure 36, Items 1 and 6).
Figure 36. Battery Cable Connections at Junction Block and Stud.
0297
14. Close main battery box cover and secure latches.
0297-33


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.